Swans on the River Brue

Bridge Halt

       
Bridge Name:   Bridge Halt
No.:   1
Location:   Tiveron Canal Basin
Build Date:   1810 - 1814
Engineer:  
     
       
  © Copyright somersetrivers.org
Description:    
This structure was started but never finished. It was planned to provide access to additional Lime Kilns which were never built.
     
References:  


Print this | Send this | Hits: 2658 | | Return to Bridge List | Prev [<< back to overview] | Next [William Authers Bridge >>]